Release Frequency (NEW LOGIC)
Starting from February 11, 2025, a new method for releasing scheduled training content will be available, making the release process more efficient and straightforward.
With the old traditional logic, a specific release had to be scheduled in the calendar for each piece of content. This method is valid until February 10, 2025.
With the new method (from February 11, 205), however, each scheduled release in the calendar will correspond to one or more pieces of content, based on the configuration of the associated path. In the case of an instant release made via the appropriate button in the calendar, the same logic will apply.
The two logics compared in the case of a module + a cup
IMPORTANT NOTICE
All paths present on the platform from February 11, 2025 (inclusive) must follow this release logic.
The paths will be configured with simultaneous releases, identifiable by activities that have the same order (order ID) for some content.
To view the order of the content in a path, simply click on the three vertical dots of the path you want to associate and select the "view" option.
In the following image, it can be seen that the order of the third module and the first cup is identical (both are assigned the number 3): this indicates that the path follows the new logic.
Paths that follow the old logic (with different order IDs for each piece of content) will no longer be visible as associable paths. However, if these paths have already been activated in the past, they will continue to be associated with users without any consequences.
BEST PRACTICES TO FOLLOW
DO NOT MODIFY THE PREGRESS if a company has already started a path with the traditional release method (with different order IDs for each piece of content) before February 11, 2025, there will be no need to intervene on the paths already assigned to the company. Furthermore, the release calendar already set according to the traditional logic should not be modified.
ADOPT THE NEW LOGIC FROM FEBRUARY 11, 2025 when associating new paths to a company, it will be necessary to follow the new logic, setting a single release in the calendar. In this case, a release will correspond to content with the same ID. New paths will be available starting from February 11, 2025, inclusive.
Releases in the case of Cyber School
In the case of the Awareness path, for example, it will no longer be necessary to schedule two pieces of content in the calendar to allow the release of the cup. With the new approach, the cups will be released automatically through a single release.
In summary, for the Cyber Guru Awareness path, it will be sufficient to plan a total of 12 releases, which will cover both the 12 training modules and the 4 cups planned for a whole year.
Example of module and cup release with the new logic
Releases in the case of Cyber Campus
This new logic is even more evident in the case of the Campus, where, with the traditional method, it was necessary to schedule two or three releases on the same day to distribute the content according to the Cyber Guru training calendar.
With this new method, on the same day it will no longer be necessary to worry about setting the exact number of releases in the calendar, but it will be sufficient to plan just one. This reduces the possibility of human error.
In summary, for the Cyber Guru Campus path, it will be sufficient to plan a total of 12 releases, which will cover the 28 training contents (8 WarmUp, 8 Didactive, 8 Cyber Insight, and 4 Cyber Game/Serious Game).
Example of the first campus release with the new logic